Purification Plant
Codevigo, Padova
KITE Engineering was responsible for the Preliminary and Executive design for the plant restoration of the first stage sludge digester at the Codevigo (PD) Purification Plant. The object of the intervention included:
– Restoration of the cogeneration system for the production of electricity through maintenance work on the gasometer storage bell;
– Installation of new Desulfuriser;
– Adaptation of the existing electrical system to serve the sludge digester;
– Replacement of existing pipes, special pieces, valves and accessories serving the sludge digester.
Project Details
Purification Plant
Codevigo, Padova
KITE Engineering was responsible for the Preliminary and Executive design for the plant restoration of the first stage sludge digester at the Codevigo (PD) Purification Plant. The object of the intervention included:
– Restoration of the cogeneration system for the production of electricity through maintenance work on the gasometer storage bell;
– Installation of new Desulfuriser;
– Adaptation of the existing electrical system to serve the sludge digester;
– Replacement of existing pipes, special pieces, valves and accessories serving the sludge digester.